Topaz Solar Farms, LLC
550 MW photovoltaic power station on the Carrizo Plain in San Luis Obispo County, California, built by First Solar and owned by BHE Renewables.
- Headquarters
- San Luis Obispo County, CA
- Specialty
- Diversified (43%)
- Parent
- BHE Renewables, LLC
- Size band
- Mid (500 MW–2.5 GW)
Interconnection queue footprint
as of 2026-03-20717 MW
Total capacity
6
Projects
0 · 0 MW
Active
0 · 0 MW
Operational
6
Withdrawn
120 MW
Avg project size
1
States
2008
First queued
Technology mix (by capacity)
Solar2 · 251 MW · 35%
Storage3 · 310 MW · 43%
Solar + Storage1 · 156 MW · 22%
Markets
CAISO 6
Where the projects are
1 state
Largest project
ROBIN 3
156 MW · Solar + Storage · CA · CAISO · Withdrawn
- · Curated research
- · ISO interconnection queues
Written profiles are hand-entered and not independently verified. Queue figures are computed from ISO interconnection data and reflect requested capacity, not built capacity.
More in Developer / IPP
InvenergyThe largest privately held US clean energy developer, also building interregional transmission.NextEra EnergyThe largest renewable generator in the world, plus Florida Power & Light.Pattern EnergyWind and transmission developer behind SunZia, the largest US renewables-plus-transmission build.RWE Clean EnergyRWE's US onshore renewables platform, built partly from the Con Edison Clean Energy acquisition.Cypress Creek RenewablesSolar and storage developer spanning distributed and utility-scale.Arevon EnergyUtility-scale solar and storage developer, owner and operator.Clearway EnergyLarge US clean energy owner-operator and development platform.Lightsource bpGlobal utility-scale solar developer, wholly owned by bp.