Walnut Creek Energy Park
Natural gas peaking plant in City of Industry, California, built by Edison Mission Energy and acquired by NRG Yield, which was later renamed Clearway Energy.
- Headquarters
- City of Industry, CA
- Specialty
- Storage (100%)
- Parent
- Clearway Energy
- Size band
- Mid (500 MW–2.5 GW)
Interconnection queue footprint
as of 2026-03-20809 MW
Total capacity
8
Projects
3 · 300 MW
Active
0 · 0 MW
Operational
5
Withdrawn
101 MW
Avg project size
1
States
2019
First queued
Technology mix (by capacity)
Storage8 · 809 MW · 100%
Markets
CAISO 4West 4
Where the projects are
1 state
Largest project
RANGER
102 MW · Storage · CA · CAISO · Withdrawn
- · Curated research
- · ISO interconnection queues
Written profiles are hand-entered and not independently verified. Queue figures are computed from ISO interconnection data and reflect requested capacity, not built capacity.
More in Developer / IPP
InvenergyThe largest privately held US clean energy developer, also building interregional transmission.NextEra EnergyThe largest renewable generator in the world, plus Florida Power & Light.Pattern EnergyWind and transmission developer behind SunZia, the largest US renewables-plus-transmission build.RWE Clean EnergyRWE's US onshore renewables platform, built partly from the Con Edison Clean Energy acquisition.Cypress Creek RenewablesSolar and storage developer spanning distributed and utility-scale.Arevon EnergyUtility-scale solar and storage developer, owner and operator.Lightsource bpGlobal utility-scale solar developer, wholly owned by bp.Intersect PowerClean infrastructure developer pairing gigawatt-scale generation directly with data center load.