Project Intelligence

Find late-stage projects before they close.

Every U.S. interconnection queue, refreshed daily. Developer scoring, tax-credit analysis, stage tracking, and contact info. Built for the team running the deal and the AI agents helping them.

Unified Project Record Construction
project: Solar Farm, Albany County
capacity_mw: 4.8 · iso: NYISO
queue_id: Q2023-118 · queued: Q2 2023
stage: Under Construction
est_cod: Q3 2026 · eligible_pct: 60
developer: Sunrise Solar LLC
dev_tier: A · completion_rate: 0.78
feoc_risk: clear
+ 120 more fields
Risk-adjusted ITC value
$2.16M effective tax credit at 60% rate. No FEOC exposure on bill of materials.
47,000+
Queue projects
5.6M
DG installations
6,593
Developer profiles
9
ISOs / RTOs
Built with data from

Built for the teams closing energy deals.

One data layer, four workflows. Filter to the deal you're running and use presets to skip straight to the projects worth a call.

BD & Origination
ProjectStageMWITC
Permian BESS 4Constr24060%
Saskatchewan E4Permit9550%
Phoenix DCStudy60040%

Source the deals before the bank does.

Late-stage queue projects with permit progress, capacity ahead, ISO withdrawal rates, and direct developer contacts. Sort by stage, technology, ITC eligibility, or developer tier.

  • Filter to "approved + under construction" in 1 click
  • Watchlists with email alerts when stage advances
  • Verified developer contact info on every record
13,400+
Late-stage projects
7
ISOs covered
Daily
Stage refresh
ITC Investors
30
+10
+10
+10
Base + EC + LI + DC = 60% effective

Stack ITC bonuses with confidence.

Every project comes with base ITC, energy community, low-income, and domestic content bonus eligibility pre-computed against the latest Treasury guidance. Screen deals on real economics, not napkin math.

  • Effective ITC rate computed per project
  • Energy Community + Low-Income overlay
  • FEOC supplier risk on the same record
$370B
In stacked credits
60%
Max effective ITC
Notice 2026-15
Latest guidance
Late-Stage Acquirers
QueuedStudyPermitNTPCOD
Mojave Storage 2 · 240MW · 87% flip probability

Find acquisition targets at NTP.

Projects ready to break ground, sorted by capacity, ISO, and developer track record. Identify the small-developer pipeline you can buy before it goes to bid.

  • Notice-to-Proceed filter across all 7 ISOs
  • Developer scoring shows who's likely to flip
  • Capital-need signals (recent equity raises, debt)
1,400+
NTP projects
A to E
Developer scoring
$5 to 500M
Typical deal size
OEM & Equipment Sales
Modules8.2 GW
Inverters4.1 GW
Batteries12.4 GWh
Transformers340 units

Sell into the right pipeline.

Track which developers are scoping inverters, transformers, batteries, and modules. Filter by technology, capacity, and timeline so your BD team calls the project before the procurement spec lands.

  • Technology mix by developer and ISO
  • Project-stage signal for procurement timing
  • API + MCP access for territory routing
6,593
Dev profiles
12
Tech categories
REST + MCP
Routing access

Every project, every field, every refresh.

One unified record per project. Every refresh, we pull from the source: ISO queue, state DG program, EIA filing, county permit office, FERC financial. Normalized into a single schema so you can filter across all 7 ISOs with one query.

Tax credits, developer track records, FEOC supplier risk, and grid context come pre-joined. No manual stitching.

  • Queue ID, technology, capacity, ISO, county, state
  • Stage tracking: queued, study, permit, build, COD
  • Effective ITC, energy community, domestic content
  • Developer tier, completion rate, recent activity
  • FEOC supplier exposure (cross-product join)
  • 130+ enriched fields total
Unified Project Record Construction
project: Solar Farm, Albany County
capacity_mw: 4.8 · iso: NYISO
queue_id: Q2023-118 · queued: Q2 2023
stage: Under Construction
est_cod: Q3 2026 · eligible_pct: 60
base_itc: 30 · ec_bonus: 10
low_income: 10 · dom_content: 10
developer: Sunrise Solar LLC
dev_tier: A · completion_rate: 0.78
feoc_risk: clear
+ 120 more fields
Risk-adjusted ITC value
$2.16M effective tax credit at 60% rate. No FEOC exposure on bill of materials.
Developer Intelligence

Know who can actually deliver.

6,593 developer profiles graded A through E based on actual completion history. Portfolio size, technology mix, parent company, recent capital raises, and ISO-by-ISO completion rates. A "Tier A" rating means something specific.

Developer Tier Region Projects Completion rate Avg. q→COD
Sunrise Solar LLC
Independent · Mid-scale
A NY, NJ, MA 23 78% 3.2 yrs
Vertex Renewables
PE-backed · Utility-scale
A TX, OK 41 71% 2.9 yrs
Coastal Power Partners
Public subsidiary · Mid-scale
B CA 18 64% 3.6 yrs
Ridge Energy Co
Independent · Mid-scale
B WI, MN, IA 31 58% 3.4 yrs
Pinewood Solar
Independent · DG-focused
C GA, FL 12 49% 4.1 yrs
Sagebrush Power
Independent · Storage
D NV, AZ 7 33% 5.0 yrs
Showing 6 of 6,593 graded developers · Updated daily Search all developers →

How most teams use it.

Sign up, paste a developer or county, and you'll have a working pipeline in under a minute.

01 · FILTER
Stage: Construction ISO: PJM ITC: 50%+ Capacity: any Tech: solar

Filter to the deal type

State, ISO, technology, capacity, stage, ITC band. Or pick a workflow preset (BD, ITC, NTP, OEM).

02 · SORT
ProjectTierCmp
Sunrise NYA78%
Vertex TXA71%
Coastal CAB64%
Ridge WIB58%

Sort by signal

Developer tier, completion probability, capacity ahead in queue, time to COD, or risk-adjusted ITC value.

03 · WATCH
🔔
3 stage updates today
2 new construction starts · 1 FEOC flag
Sunrise NY → Construction
Vertex TX → Permit approved

Save to a watchlist

Email alerts when projects advance stage, change ownership, file new docs, or hit a FEOC flag.

04 · EXPORT
CSV
PDF
REST
MCP

Export or query

CSV for your CRM, PDF for the deal memo, REST and MCP for your model or AI agent.

Data Sources

Direct from the source, refreshed daily.

No paid intermediaries, no scraping resellers, no stale exports. We hit the original feed on every refresh and normalize into one schema.

EIA

Form 860M for existing and planned generators. Form 861 for DG installations and net metering.

EIA
7-day refresh activity
Live5.6M+ rows · monthly

FERC

Form 1 financials, Order 2023 interconnection filings, and generator registrations.

FERC
7-day refresh activity
LiveDaily filings feed

State DG Programs

NEM, Net Billing, SREC, and community solar registries. DG project-level data per state.

NJ Clean Energy Illinois Shines MA SMART
7-day refresh activity
Live40+ state programs

County Permits

Solar, wind, and BESS permit filings stitched to queue records where county data is available.

County permits
7-day refresh activity
Live3,200+ counties

NREL + LBL

Lawrence Berkeley queue assembly, NREL ATB, technology cost curves, and market context layers.

NREL LBNL
7-day refresh activity
LiveAnnual + quarterly

Treasury / IRS

Energy Community, Low-Income, and Domestic Content layer files for ITC stacking computation.

Treasury IRS
7-day refresh activity
LivePer-project pre-computed

Federal Lists (FEOC)

DOD 1260H, UFLPA, BIS, OFAC, SEC, IRS. All 10 lists cross-joined to project supplier records.

DOD BIS OFAC
7-day refresh activity
Live25,000+ entities

+ 80 more feeds

USGS minerals, HIFLD grid infrastructure, USWTDB wind turbines, EPA, NERC, USPTO patents.

USGS NERC DOE
7-day refresh activity
Live90+ feeds total