Every U.S. interconnection queue, refreshed daily. Developer scoring, tax-credit analysis, stage tracking, and contact info. Built for the team running the deal and the AI agents helping them.
One data layer, four workflows. Filter to the deal you're running and use presets to skip straight to the projects worth a call.
Late-stage queue projects with permit progress, capacity ahead, ISO withdrawal rates, and direct developer contacts. Sort by stage, technology, ITC eligibility, or developer tier.
Every project comes with base ITC, energy community, low-income, and domestic content bonus eligibility pre-computed against the latest Treasury guidance. Screen deals on real economics, not napkin math.
Projects ready to break ground, sorted by capacity, ISO, and developer track record. Identify the small-developer pipeline you can buy before it goes to bid.
Track which developers are scoping inverters, transformers, batteries, and modules. Filter by technology, capacity, and timeline so your BD team calls the project before the procurement spec lands.
One unified record per project. Every refresh, we pull from the source: ISO queue, state DG program, EIA filing, county permit office, FERC financial. Normalized into a single schema so you can filter across all 7 ISOs with one query.
Tax credits, developer track records, FEOC supplier risk, and grid context come pre-joined. No manual stitching.
6,593 developer profiles graded A through E based on actual completion history. Portfolio size, technology mix, parent company, recent capital raises, and ISO-by-ISO completion rates. A "Tier A" rating means something specific.
| Developer | Tier | Region | Projects | Completion rate | Avg. q→COD |
|---|---|---|---|---|---|
|
Sunrise Solar LLC
Independent · Mid-scale
|
A | NY, NJ, MA | 23 | 78% | 3.2 yrs |
|
Vertex Renewables
PE-backed · Utility-scale
|
A | TX, OK | 41 | 71% | 2.9 yrs |
|
Coastal Power Partners
Public subsidiary · Mid-scale
|
B | CA | 18 | 64% | 3.6 yrs |
|
Ridge Energy Co
Independent · Mid-scale
|
B | WI, MN, IA | 31 | 58% | 3.4 yrs |
|
Pinewood Solar
Independent · DG-focused
|
C | GA, FL | 12 | 49% | 4.1 yrs |
|
Sagebrush Power
Independent · Storage
|
D | NV, AZ | 7 | 33% | 5.0 yrs |
Sign up, paste a developer or county, and you'll have a working pipeline in under a minute.
State, ISO, technology, capacity, stage, ITC band. Or pick a workflow preset (BD, ITC, NTP, OEM).
| Project | Tier↓ | Cmp |
|---|---|---|
| Sunrise NY | A | 78% |
| Vertex TX | A | 71% |
| Coastal CA | B | 64% |
| Ridge WI | B | 58% |
Developer tier, completion probability, capacity ahead in queue, time to COD, or risk-adjusted ITC value.
Email alerts when projects advance stage, change ownership, file new docs, or hit a FEOC flag.
CSV for your CRM, PDF for the deal memo, REST and MCP for your model or AI agent.
No paid intermediaries, no scraping resellers, no stale exports. We hit the original feed on every refresh and normalize into one schema.





Form 860M for existing and planned generators. Form 861 for DG installations and net metering.

Form 1 financials, Order 2023 interconnection filings, and generator registrations.

NEM, Net Billing, SREC, and community solar registries. DG project-level data per state.
Solar, wind, and BESS permit filings stitched to queue records where county data is available.

Lawrence Berkeley queue assembly, NREL ATB, technology cost curves, and market context layers.
Energy Community, Low-Income, and Domestic Content layer files for ITC stacking computation.
DOD 1260H, UFLPA, BIS, OFAC, SEC, IRS. All 10 lists cross-joined to project supplier records.
USGS minerals, HIFLD grid infrastructure, USWTDB wind turbines, EPA, NERC, USPTO patents.