Duke Energy Progress — Cumberland South 500 kV

Interconnection queue entry tied to the Cumberland South 500 kV point of interconnection on Duke Energy Progress's North Carolina transmission system.

Headquarters
NC, United States
Specialty
Gas (100%)
Parent
Duke Energy
Size band
Mid (500 MW–2.5 GW)

Interconnection footprint

as of 2026-03-20
1.2 GW
Total capacity
1
Projects
0 · 0 MW
Active
0 · 0 MW
Operational
1
Withdrawn
1.2 GW
Avg project size
1
States
2016
First queued
Technology mix (by capacity)
Gas1 · 1.2 GW · 100%
Markets
Southeast 1
Where the projects are
AKMEVTNHWAIDMTNDMNILWIMINYRIMAORNVWYSDIAINOHPANJCTCAUTCONEMOKYWVVAMDDEAZNMKSARTNNCSCDCOKLAMSALGAHITXFL
1 state
Largest project
Butler-Warner Generation Plant
1.2 GW · Gas · NC · Southeast · Withdrawn