Builder of the Colossus supercomputer complex in Memphis, one of the largest single electrical loads in the United States, now merged into SpaceX.

xAI built Colossus in Shelby County, Tennessee — with expansion into Southaven, Mississippi — around self-supplied generation rather than waiting in an interconnection queue. Solaris Energy Infrastructure has roughly 400 MW of gas turbines serving the site out of a 600 MW fleet and expects over 1.1 GW operating for xAI by Q2 2027, while a permanent 1.2 GW simple-cycle plant of 41 turbines was authorized under a PSD permit in March 2026. The first Colossus 2 cluster, about 110,000 GB200-class GPUs drawing roughly 210 MW, came online in January 2026, and around 720 Tesla Megapack containers provide multi-gigawatt-hour onsite storage. SpaceX acquired xAI in an all-stock merger completed in February 2026 valuing the combined company at $1.25 trillion; the business now presents as SpaceXAI.

Headquarters
United States
Business model
Services
Ownership
Acquired by SpaceX
Sells to
ConsumersEnterprisesDevelopers
Interconnection queue footprint

No queue positions recorded under this name. Expected for software, capital and supply chain companies, which do not hold interconnection requests.

Sources
  • · Curated research

Written profiles are hand-entered and not independently verified. Queue figures are computed from ISO interconnection data and reflect requested capacity, not built capacity.

More in Hyperscalers